Voyager Mission Operations Status Report # 2009-02-13,  Week Ending  February 13, 2009

 

Command Transmission & Verification Operations

 

Voyager 1 command operations consisted of the uplink of a Command Loss Timer Reset on 2/09 [DOY 040/1530z].  The command was not transmitted due to hydraulics problems at DSS-14 [DR G109242].  The command was rescheduled later in the day over DSS-63 on 02/10 [DOY 041/0245z]. The spacecraft received

 the command.

 

There were no command operations in support of Voyager 2 during the period due to the extended downtime of DSS-43.

 

Sequence Generation Operations

 

No sequence development activities during this report period.

 

Data Return Operations

 

Voyager 1 Data Processing and Operations:

 

There were 69.2 hours of DSN scheduled support for Voyager 1 of which 25.8 hours were large aperture coverage. There was one real-time support change on 02/09 [DOY 040] when DSS-15 supported 1.9 hours in place of 4.0 hours of DSS-14 coverage declared Red due to hydraulics problems [DR G109242].  The total actual support was 67.1 hours of which 21.8 hours were large aperture coverage

 

There were three significant outages during the period.  The first two outages were caused by weather at DSS-15.  The first outage of 2.9 hours occurred on 02/07 [DOY 038, DR G109234].  The second outage of 1.4 hours occurred two days later on 02/09 [DOY 040, DR G109243].   The third outage of 2.8 hours was caused by hydraulics problem at DSS-14 on 02/09 [DOY 040, DR G109242].

 

Science instrument performance was nominal for all activities during this period.  One frame of GS-4 data was recorded this week.  A second frame of GS-4 data was recorded on February 7.  The EDR backlog is 2 days.

 

 

Voyager 2 Data Processing and Operations:

 

There were 44.4 hours of DSN scheduled support for Voyager 2 of which 0 hours were large aperture coverage.  There were no real-time or schedule support changes made or significant outages during the period

 

Science instrument performance was nominal for all activities during this period.  The EDR backlog is 1 days.

 

Flight System Performance

 

Voyager 1 performance was nominal during this report period.  Activity included switching back to X-Band low power on 2/9 [DOY 040].

 

Voyager 2 performance was nominal during this report period.  Activity included a PMPCAL on 2/10 [DOY 041/042].

 

PROPELLANT/POWER CONSUMABLES STATUS AS OF THIS REPORT

 

 

Spacecraft

Consumption

One Week (Gm)

Propellant

Remaining (Kg)

Output

(Watts)

Margin

(Watts)

1

55.78*

26.81

278.8

33

2

4.92

28.51

280.3

35

                                                            *MAGROL 09-037/1258

 

RANGE, VELOCITY AND ROUND TRIP LIGHT TIME AS OF 2/13/2009

 

 

Voyager 1

Voyager 2

Distance from the Sun (Km)

16,308,000,000

13,204,000,000

Distance from the Sun (Mi)

10,134,000,000

8,204,000,000

Distance from the Earth (Km)

16,350,000,000

13,306,000,000

Distance from the Earth (Mi)

10,160,000,000

8,268,000,000

Total Distance Traveled Since Launch (Km)

20,706,000,000

19,717,000,000

Total Distance Traveled Since Launch (Mi)

12,866,000,000

12,252,000,000

Velocity Relative to Sun  (Km/sec)

17.091

15.517

Velocity Relative to Sun  (Mi/hr)

38,230

34,709

Velocity Relative to Earth  (Km/sec)

21.422

29.001

Velocity Relative to Earth  (Mi/hr)

47,919

64,873

Round Trip Light Time (hh:mm:ss)

30:17:00

24:39:16