Voyager Mission Operations Status Report # 2009-09-11,  Week Ending  September 11, 2009

 

Command Transmission & Verification Operations

 

Voyager 1 command operations consisted of the uplink of a Command Loss Timer Reset on 09/10 [DOY 253/2130z].  The spacecraft received the command.

 

Voyager 2 command operations consisted of the uplink of seven bracketed Command Loss Timer Resets sent on five-minute centers using 0.5 Hz steps on 09/09 [DOY 252/1432z].  The spacecraft received four of the seven commands sent.

 

Sequence Generation Operations

 

Continue sequence development of CCSL A073.

 

Data Return Operations

 

Voyager 1 Data Processing and Operations:

 

There were 99.5 hours of DSN scheduled support for Voyager 1 of which 64.3 hours were large aperture coverage. There were no real-time or schedule support changes made during the period.

 

There was one significant outage of 0.8 hours on 09/10 [DOY 253] due to a DCC-3 problem at DSS-45 [DR C107085].

 

Science instrument performance was nominal for all activities during this period.  One frame of GS-4 data was recorded this week.  A second frame of GS-4 data was recorded on September 11.  The EDR backlog is 2 day.

 

 

Voyager 2 Data Processing and Operations:

 

There were 72.1 hours of DSN scheduled support for Voyager 2 of which 44.3 hours were large aperture coverage. There were no real-time or schedule support changes made during the period.

 

There were two significant outages both due to rain. The first outage of 1.2 hours occurred over DSS-45on 09/06 [DOY 249, DR C107075].  The second outage of 0.8 hours occurred also during a DSS-45 support on 09/08 [DOY 251, DR C107081]

 

 

Science instrument performance was nominal for all activities during this period.  The EDR backlog is 2 days.

 

 

Flight System Performance

 

Voyager 1 performance was nominal during this report period.  Activity included turning on the AB Gyros on 9/9 (DOY 252).

 

Voyager 2 performance was nominal during this report period.  Activity included switching to the BC Gyros on 9/11 (DOY 254).

 

PROPELLANT/POWER CONSUMABLES STATUS AS OF THIS REPORT

 

 

Spacecraft

Consumption

One Week (Gm)

Propellant

Remaining (Kg)

Output

(Watts)

Margin

(Watts)

1

4.69

26.54

276.5

20

2

5.27

28.22

277.8

18

 

 

RANGE, VELOCITY AND ROUND TRIP LIGHT TIME AS OF 9/11/2009

 

 

Voyager 1

Voyager 2

Distance from the Sun (Km)

16,617,000,000

13,475,000,000

Distance from the Sun (Mi)

10,325,000,000

8,373,000,000

Distance from the Earth (Km)

16,626,000,000

13,411,000,000

Distance from the Earth (Mi)

10,331,000,000

8,333,000,000

Total Distance Traveled Since Launch (Km)

21,269,000,000

20,241,000,000

Total Distance Traveled Since Launch (Mi)

13,216,000,000

12,577,000,000

Velocity Relative to Sun  (Km/sec)

17.080

15.501

Velocity Relative to Sun  (Mi/hr)

38,205

34,674

Velocity Relative to Earth  (Km/sec)

44.601

40.256

Velocity Relative to Earth  (Mi/hr)

99,768

90,051

Round Trip Light Time (hh:mm:ss)

30:47:52

24:51:06